Preston Middle School

Schedule Challenge / Time Restrictions

Preston Middle School needed a new roof that had to be installed while the students were on their summer break.  The 80,000 SF of Ballasted EPDM membrane and river rock was removed and recycled.  Then two layers of Johns Manville Duraboard Insulation, a base ply of JM Dynabase, and DynaKap FR Cap Sheets were installed using JM MBR Adhesive.  The roof was completed two weeks prior to the students’ return making Poudre School District very pleased with choosing Front Range Roofing Systems, LLC for this project.